| Service | Price |
|---|---|
| General Conditions & Management 10100 | $342.50 |
| Demolition & Debris Removal 10101 | $407.50 |
| Shower Door Removal 10109 | $150.00 |
| Glass Shower Door — Customer's Door 10109 | $2,700.00 |
| Drywall Repair — Living-Room Ceiling Patch 10107 | $575.00 |
| Shower Liner Rebuild & Re-Tile 10116 | $1,502.30 |
| Plumbing — Shower Floor Drain Replacement 10120 | $581.00 |
| Plumbing — Toilet Wax Ring Reset 10120 | $150.00 |
| Interior Painting 10113 | $275.00 |
| Subtotal | $6,683.30 |
| Discount — 10% | −$668.34 |
| Total | $6,014.96 |
Scope: Bathroom shower leak repair on a 47 in. × 31 in. tile shower — remove the existing shower door and haul it off, remove the tile below the liner line only (partial, approx. 35 sq ft including the shower floor), remove the failed floor liner, rebuild with a new liner set in a pre-slope of 1/4 in. per ft to the drain and clamped at the drain flange with weep protection, replace the shower floor drain, re-tile the 47 in. × 31 in. shower floor and the wall band up to 24 in. with matching tile, carry the customer's new glass shower door (full front plus a half side panel at the tub) at the customer's price — installed by the door supplier, not by this contract — patch the drywall hole in the living-room ceiling below the leak, and paint to match the repaired area.
Tile: Homeowner supplies the matching tile from the extra material on hand; the contractor supplies the setting materials, grout and trim. Existing tile above the 24 in. line stays in place.
Shower door & glass: The existing door is removed and hauled off — it is not reinstalled. The customer's new glass shower door (full front with a half side panel at the tub) is carried in this estimate at the customer's price of $2,700.00. The door is ordered and installed by the door supplier once the tile is set and the opening is measured; door installation labor is not part of this contract. Allow approximately 2–4 weeks from field measurement for fabrication. The glass is custom sized to the finished opening — no alignment risk from the old door.
Plumbing (broken out): Shower floor drain replacement $581.00 plus the toilet wax-ring reset $150.00 — the two items that make up the plumbing section. Shower valve and trim are not included.
Discount: 10% off the subtotal ($668.34) — shown as its own line in the Itemized Estimate and in Included Services.
Not included: Full tile wall replacement above the 24 in. line, new shower valve and trim, glass upgrades (1/2 in. glass, low-iron glass, factory protective coatings, designer hardware finishes), vanity / toilet work beyond resetting the toilet with a new wax ring, cabinets, flooring or work outside the bathroom, and any structural or plumbing rough-in work beyond the shower floor drain. Concealed damage found once the shower is open (rot, mold, framing) is quoted as a change order before it is repaired.
Contractor supplies: Liner membrane, pre-slope materials, clamping drain assembly, setting materials, grout, drywall and joint compound for the ceiling patch, wax ring and paint for the repaired area.
Notes: Jobsite will be left clean once completed. Waterproofing is tested before the tile goes back down.
Warranty: 12 months workmanship.
Payment: Total $6,014.96. Deposit $3,007.48 — upon signing · Upon completion of project $3,007.48.
Check is a preferred method.
Pay by credit card: request.plastiq.com/pay-tidewater-home-improvement-llc
Cards not eligible for payment: Virtual Affirm credit card
Validity: valid until September 17, 2026.